This project blog »

Page 2 of 2 :

Project blogs

205A Morning Lane

By: Larisa Blazic

205A Morning Lane is a site-specific video installation. It marks the end of 205A Morning Lane studio building with two sets of visuals projected to the building’s windows.

The video installation can be seen each night at 205A Morning Lane, London E9 from 25th - 29th April 2007.

PRIVATE VIEW: 26TH APRIL 2007 7-9PM

Morning Lane Studios
205A Morning Lane
London
E9 6LG

http://www.e-w-n-s.net

Larisa Blazic, ‘Invite’

[enlarge]
Larisa Blazic, ‘Invite’

# 7 [2 April 2007]

errr, just wrote everything i had on my mind for this entry and then i did not upload it :( and it's lost. well, next time copy and paste into text editor as this media is super unstable...

so, i reflected on the stuff i bought and what else needs to be bought - i'll go in about an hoeu to see alexei's mount to idetify what i need to fix projectors to a ceiling and i still need to buy, probably some adhesive tape to fix curtains i bought yeaterday.

i'm very gratefull to everybody who helped - already made credits list for my web site - i'll upload it closer to the event... it was a meeting with frixos and vasiliki this saturday at the building, that reminded me how many people selflessly helped the project so far :) thank you all.

then, i wrote about postcard - digital version is finished and now i need to make a list of people who i'd like to invite + to send it out to several mailing lists... that should help marketingwise. i decided not to print invites... we'll see but i'd like to have printed material next time. for private view i'll have A4 press release and postcards will be sent by email.

video is moving slowly - there's still no click, but it is maybe because i did not do a test with two stripes of eyes to simulate the projection. also, have to remind artists about new shoot next week...

Larisa Blazic, ‘eyes in progress’

[enlarge]
Larisa Blazic, ‘eyes in progress’

# 6 [30 March 2007]

my apologies for typos and lowsy spelling.
i think that "rocky road productions" describe the curent state of affair in the best possible way... well, it's not all so bad but there were some changes in number of projectors i'm getting from SPACE, which called for new round of figuring out who to approach to replace the missing projectors... luckily enough, my old friend and collaborator Alexei Blinov came to resque with one projector. i still need one more. its getting a bit complicated now and i'll have to keep tabs on who's projectors i'm using for which days...
started working with video. at this point i'm just going through the material i filmmed so far and playing a little to see what have i made so far. btw, i completely forgot how much time it takes after effects to export a quick time movie... although, i dont think i'll use it for the piece - it's just for experimentation. so it'll be a final cut work - editing and finding the best loops that will work out well together. i'm looking for synchronicity, for movements of eyes that are similar and that will, when combined as different lenght loops, produce "pulsation".... we'll see...

# 5 [28 March 2007]

as march is coming to an end i was supposed to eccelerate towards final confirmations and start of production. unfortunately, i hurt my back last saturday so everything was brought to a halt. well, not everything, SPACE let me know yesterday they have projectors available a week earlier that initially planed - i will do everything possible to get them to re-confirm for the 23rd to 29th. it will be quite a job to get everybody else say yes to switched dates... it is quite a problem when you are working withought a proper budget and just hire equipment - this will be a great lesson to learn for the future.
also, with this compications i am not sure if i can pull out the private view - my intiial idea was to have my ex studio-mate, annie davey, playing some records and drinks just before the projections are switched on, on 26th april... four days into the installation... but now i'm monitoring sunsets and on 26th sun sets at 8.10 pm. the building's location is such that it doesn't have any barrier in front - so as long as there's daylight, the projections are going to be hardly visible... and that's nearly 9 pm... i'm not sure how to get people come to private view and wait to get dark???!!!
also, there are plans to do an open studio weeken 18th to 20th may, and i agreed to help with designing a postcard invite - Frixos asked me if i'd be interested to put one of the images of the installation to the postcard, which brought me to the point of reconsidering printing of my own postcards... now, with new developments in dates... i might drop printed invites and only send email invite to various mailing lists and use open studio postcard to promote 205A morning lane installation (a month later that it is happening)...
video, i cant think about it now, there are several techocal issues i need to resolve... like how to do a loop that will play for 4 hours without actually making 4 hours long video loop...
one good new is that yesterday i went to meet with Free Form's Dan Barker, IT support guy, who was very positive about installin the installation and even offered some boards to mount projectors. we discussed how to test projectors (ther will be 10 differnt projectors, so we have to test them all in order to get the best possible projections), how to fix net curtains.
it will be okay, artists of morning lane studio buliding were very supposrtive last week at the meeting and agreed to help with aditional filming, and maybe i get some of them help me with installing things... fingers crossed :)

 one of the versions for postcard

[enlarge]
one of the versions for postcard

# 4 [20 March 2007]

working for money takes up my time... but it has to be done :) i'm teaching at the university of westminster on BA graphic information design. besides working on my installation, i'm trying to develop strategy for teaching software in art/design... not easy.
marketing is moving and i'm very happy about it. next issue of computer arts will have something about the project... great! thanks kdd!
postcards, i'm waiting for the meeting tomorrow to get final confirmation and finish artwork for postcards. want to send them to print on next monday... annie agreed to play some records at the opening, that will be wonderful :)
now i need start thinking about net curtains, washing windows, extension cables...

 new night view

[enlarge]
new night view

# 3 [13 March 2007]

third day of filming - i love working with artists :) everybody i filmed till now was great. i'm not doubting collaborative side of the project anymore!
thanks to: annie davey, vasiliki gkotsi, robert bramwell-jones and frixos (have to get his last name).
tomorrow, i'll be filming two more artists, one moved out of the studio already, i'm not sure if the ohet found something yet.
so far it is about half of the people i filmed found studios or some suitable arangement... i wonder how the rest are doing... we'll have "the building" meeting with Anna Harding and Fiona Furness of SPACE and talk about this project and the idea of open studio day(s) as last chance to mark the end of the building... i will on the other hand try and get SPACE help out with opening evening :)
i made a new picture last night to depict the idea... after talking to annie today, i've been thinking about editing a lot... the projections will change every night. so far i have some maneuvering space and just wondering how similar the final output will be to what i'm imagining now...

 will have to make a new mock-up night view picture tonight

[enlarge]
will have to make a new mock-up night view picture tonight

# 2 [12 March 2007]

yesterday i started shooting - robert bramwell-jones was the first to "blink" for me. although i had my doubts about the level of collaboration on this project, robert proved to be great artist to start filming with - he pointed out some things i havent been thinking about... meaning of "left" and "right" in this project and how can that be used in reading of this piece... thanks robert :)
today, i'll continue filming + still working on press release, artwork for postcard... one thing is still not clear - opening night... but should have that sorted out by 21st march.
and, yes, i'll be washing a lot of windows for easter holiday :)

 205A Morning Lane proposed view

[enlarge]
205A Morning Lane proposed view

# 1 [6 March 2007]

Ok, so this is how it all started: I had this vision of eyes blinking... many, many eyes placed next to eachother, just blinking. Blinking was to me a sign of a moment at first, moment(s) that are usually taken for granted... moment(s) that we do not pay attention to because of various entanglements with past or future.Then, it occured to me that "closing eyes" as an expression has also some connection to this idea.
At the same time I heard that the buliding in which I shared a studio with Annie Davey is about to be demolished and that all of us have to move out by the end of October this year. That's when things started to click together. It was the end of the building, the end - eyes closing - the end. At the same time it became obvious that since all of the artists in the building are mainly visual artists - it had to be our eyes... Our production is directly affected by this change.
Then, I approached SPACE, who are managing the building with the idea of making an outdoor video installation that marks the end of the building. It was a move made in Cairos - "the right moment". They were more that happy to hear about this as they believed there has to be something done that raises awareness of this trend - closing down artists' studio buildings.
Later, FREEFORM, a public art organisation also based in East London, expressed their interest in supporting the project. Which brings me to present and the current state od production:this is a self funded public art project with strong in-kind support. It makes me a bit worried, but also it raises great determination to make this project happen. Right now I'm working on pubilicity, which makes me super stressed as I never did it before. Finally I have dates confirmed for projections: 23rd - 29th April. Luckily enough, friends help :)

This project blog »

Page 2 of 2 :

Larisa Blazic

My work is focused on interactive site-specific installation exploring audience participation, real-time audio distribution and networked audio-video installation. It explores location as main carrier of meaning, aesthetics of everyday urban experience, creative use of surveillance technologies, real-time video stream and moving image in the context of temporary public art interventions and its communication to wider audience. It utilises my architectural background and extensive experience of audiovisual and digital media production to explore relationship between location and content.

www.e-w-n-s.net